Permeable and water-retaining soil-based pavement "Tosu Soil Method"

Quickly absorbs and retains rainwater! Also has weed prevention effects, and the hardness of the pavement surface can be adjusted!

The "Tosu Soil Construction Method" involves mixing additives into the soil to transform it into a granular structure, thereby improving its permeability and water retention. It allows for adjustments in hardness, making it suitable for a wide range of applications from soft grounds to firmer pathways. Not only cement-based solidifying agents can be used, but also the environmentally friendly solidifying agent "Doctor" (NETIS CB-120028). 【Features】 ○ NETIS registered product QS-060005-V ○ Good water permeability ○ Prevents muddy conditions, reduces puddles, and mitigates dust and cracking ○ Can help reduce temperature increases due to the heat island phenomenon → Useful for heatstroke prevention For more details, please download the catalog or contact us.

  • Paving Materials
  • Pavement construction

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

A construction method that allows anyone to lay continuous rebar: "FK Mesh Panel Method."

【Approximately 70% reduction in rebar installation process】 Achieving accurate rebar pitch and placement angles! 1300 square meters can be completed by 4 workers in one day. *NETIS registered product

The "FK Mesh Panel Method" is a construction method that shortens the process of laying rebar in continuous reinforced concrete pavement using diagonal rebar mesh. Since it is not necessary to bundle individual rebar pieces, laying can be done without rebar workers. The amount of rebar that can be installed per person increases by 6 to 9 times, allowing for labor savings. Additionally, there is no reduction in the strength of the rebar base material due to thermal effects caused by electric resistance welding. 【Features】 ■ Laying is possible without rebar workers ■ Labor savings ■ Total cost reduction through process shortening ■ Stable quality ■ Delivery by regular large vehicles is possible, eliminating the need for special vehicle applications ■ NETIS registration <Registration number: CG-160007-VE (Promoted Technology)> *For more details, please download the PDF or feel free to contact us.

  • Paving Materials
  • Civil Engineering Method
  • Paving of sidewalks, roads, parking lots and stadiums

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Reinforcement installation process for continuous reinforced concrete pavement FK mesh panels.

Introduction of the process shortening effect of the FK mesh panel method for continuous reinforced concrete pavement.

Introducing the "Reinforced Concrete Pavement Continuous Rebar Installation Method." The continuous rebar installation for the area to be poured in one day is completed in one day by introducing the FK mesh panel method. NETIS Registration Number: CG-160007-VE NETIS Utilization Evaluation: Promotion of Utilization Technology This method reduces the risk of delays due to adverse weather conditions. Furthermore, it alleviates the burden on workers during operations in extreme heat, allowing for a reduction in the construction schedule by approximately 70%. 【Delivery Achievements】 ■ Shin-Tomei Expressway, Shinshiro Pavement Construction ■ Hamada-Misumi Road, Shirahama District Pavement Construction ■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Osaka Side) ■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Wakayama Side) ■ Tottori Expressway, Sabuchi Tunnel Pavement Construction, etc. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method
  • Paving Materials

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

<Introduction to Factory Interior> FK Mesh Panel

【Approximately 70% reduction in rebar installation process】 Achieving accurate rebar pitch and placement angles! 1300 square meters can be completed by 4 workers in one day. *NETIS registered product

This is a photo from our factory of the original "FK Mesh Panel," which has successfully significantly improved the efficiency of the labor-intensive task of tying rebar at the site of continuous reinforced concrete pavement.

  • 4-2.jpg
  • 4-3.jpg
  • Paving Materials